What We Do – No Bull
We tear out, rebuild, and resurface commercial parking lots that take a beating every day. From the strip malls on Oakland Park Boulevard to the big-box centers near Sawgrass Mills, we've seen what the sun and rain do to asphalt. Our crews know how to fix base failure caused by old limestone that's turned to mud under the surface. We don't just throw a new coat of blacktop on top of a bad base – that's a waste of your money.
When we resurface, we mill off the old surface, fix the base rock where it's failed, apply a tack coat, and lay down fresh asphalt with proper vibratory compaction. We make sure the drainage works so you don't get water pooling after a hurricane. We've done jobs at Sunrise Lakes, Welleby, and Sunrise Golf Village – places where the HOA needs it done right the first time.
The South Florida Problem – Heat, Rain, and Base Failure
South Florida's sun oxidizes the asphalt binder, turning it brittle and gray. Then the summer rains – and the hurricanes – pound the surface. Water finds the cracks, gets under the asphalt, and softens the base rock. That's when you see alligator cracking, potholes, and depressions. We've pulled up parking lots where the base was nothing but wet sand and old shell rock that crumbled.
We fix it by excavating the failed areas down to solid material, adding new DOT-spec base rock, and compacting it in lifts. Then we pave with a mix designed for our climate – higher binder content to resist oxidation, and a polymer-modified asphalt that holds up to the heat. We also route cracks and seal them with hot rubber before we overlay. That stops water from getting in again.
Our Process – From Start to Striping
First, we walk the lot with you and mark out the bad spots. We core samples if needed to check base thickness. Then we plan the milling – we mill the edges so the new asphalt ties in cleanly with curbs and gutters. We also adjust any drainage issues – regrading low spots where water sits.
We pave with a crew that's been together for years. We use a paver that lays a smooth mat, and we compact with rollers – vibratory for the breakdown, static for the finish. The tack coat is applied at the right rate – too little and it won't bond, too much and it bleeds. After the asphalt cools, we stripe it with high-durability traffic paint or thermoplastic. We can also apply a coal-tar emulsion sealcoat if that's what you want, but we recommend a fresh overlay instead if the base is still good.
Commercial Projects We've Handled
We've paved the access roads and parking lots at Sunrise Lakes – that's a huge retirement community with tight timelines and strict noise restrictions. We've done the shopping centers near Welleby, where the traffic is constant and the lot had to stay open during construction. We worked on the Sunrise Golf Village clubhouse lot – had to match the elevation perfectly so the golf carts could cross without scraping.
We also do gas stations, fast-food drive-thrus, and church parking lots. Each has its own challenges – fuel spills that soften asphalt, heavy truck traffic, or just the need to get it done over a weekend. We've learned to work fast without cutting corners.
Why Hire Us – Experience and Honesty
I've been in this business since 2004. I've seen contractors who bid low and then add change orders for every mud puddle they find. We give you a fixed price based on what we see, and if we find something bad when we start digging, we call you and explain before we do anything extra. We don't hide stuff.
We're licensed and insured in Sunrise and all of Broward County. We pull permits when required – and we know when they are required. We also warranty our work – one year on materials and labor, because we stand behind what we put down. If a patch settles or a crack comes back, we fix it.